File #: 20-0274    Version: 1 Name:
Type: Discussion Items Status: Agenda Ready
File created: 11/6/2020 In control: Special Meeting
On agenda: 11/10/2020 Final action:
Title: Discussion of Draft Reverse Osmosis Preliminary Engineering Report and Water Rate Study Summary: The Town is currently evaluating alternatives for long-term water supply, including continued use of the existing wellfield with modifications to the treatment plant to address removal of chlorides through membrane treatment. The primary objective of this Preliminary Engineering Report (Report) is the development of construction and operation and maintenance (O&M) cost estimates for water treatment system improvements to assist the Town in making a decision on the management of its long term water supply. The other option for long-term water supply involve decommissioning the existing water treatment plant and becoming retail water customers of Pinellas County. If the Town wishes to continue with potable water production, a new Reverse Osmosis (RO) treatment plant is recommended to reduce chloride and TDS concentrations and to address ongoing operational, maintenance and safety concerns...
Sponsors: JP Murphy
Attachments: 1. Town of Belleair WTP - RO PER_EXEC SUMM, 2. Belleair RO WTP_draft_with Updated Exec Sum_11-2-20, 3. Rate Study, 4. Presentation Slides.pdf
Related files: 20-0293
Date Ver.Action ByActionResultAction DetailsMeeting DetailsAudio
No records to display.
Summary
To: Finance Board
From: JP Murphy, Town Manager
Date: 10/15/2020
______________________________________________________________________
Subject:
Title
Discussion of Draft Reverse Osmosis Preliminary Engineering Report and Water Rate Study

Summary:
The Town is currently evaluating alternatives for long-term water supply, including continued use of the existing wellfield with modifications to the treatment plant to address removal of chlorides through membrane treatment. The primary objective of this Preliminary Engineering Report (Report) is the development of construction and operation and maintenance (O&M) cost estimates for water treatment system improvements to assist the Town in making a decision on the management of its long term water supply. The other option for long-term water supply involve decommissioning the existing water treatment plant and becoming retail water customers of Pinellas County.

If the Town wishes to continue with potable water production, a new Reverse Osmosis (RO) treatment plant is recommended to reduce chloride and TDS concentrations and to address ongoing operational, maintenance and safety concerns at the water treatment plant (WTP). Reports are provided as attachments; each with executive summaries of their own, but should be considered together for purposes of discussion of future direction of the system.

Besides developing preliminary engineering requirements for the proposed RO WTP systems, the PER was developed to provide the Town with capital and operations & maintenance (O&M) costs for the proposed WTP. Also, a potential phased implementation plan was developed that focuses on using the existing WTP infrastructure to the extent possible to reduce initial capital costs. In addition, the phased approach implements new treatment processes and modifications, only as needed, to address chloride and TDS levels projected to increase over time

In conjunction, with the proposed costs of conversion to RO a water rate st...